Jason Martin - TOLL
"C.J. Pearce Pty Ltd delivered a new HV Installation at Webb Dock for Toll Shipping, including the HV Switch room. Their expertise ensured compliance, smooth delivery, and issue resolution, demonstrating a strong grasp of electrical and environmental factors in shipping and logistics."
Hendre Bezuidenhout, ABB
"ABB engaged C.J. Pearce to assist in the delivery of major private and public projects as well as small scale electrical maintenance works. They actively participate in upskilling their employees meaning that their technicians always have an understanding of the equipment and works required in the wide range of environments we place them in."
Rahul Banerjee, ANSTO
“C.J. Pearce Pty Ltd have recently been engaged to deliver 3 beamlines for the Bright Common Systems Installations at the Melbourne Synchrotron Facility for the Australian Nuclear Science and Technology Organisation. These works have included the full installation of wiring and cabling for personnel safety systems, equipment protection systems, data systems, motion and vacuum cables, light and power and including all cable containment. This work is delivered in a highly sensitive area with the potential of exposure to hazardous radiation.
Throughout the project delivery, C.J. Pearce have met all Federal compliance requirements relating to safety and reporting which are numerous in this type of area. They have been pro-active in reviewing their processes to ensure that the safe delivery of the project can continue throughout the changing requirements of the COVID pandemic. They have also been accommodating in working to variations that arise as the dynamics of the project delivery changes.
We would welcome and fully consider submissions from C.J. Pearce on any and all future tenders”
Mick McKersie, Sorbent Paper Company
“C.J. Pearce Pty Ltd have been working with Sorbent over many years delivering many projects during high demand periods in environments with ever changing requirements. Throughout this time, we have found C.J. Pearce to be most accommodating in meeting the changing demands of our environment. Recently during the pandemic and the subsequent demand for our product, C.J. Pearce have made themselves available to us whilst working in with our production schedule.
As a result of their collaborative approach, we have been able to ensure that work is completed to our plant as required to continue to meet the increased demand for our product with little to no disruption to our production schedule. Their staff have been diligent in adapting to and meeting any safety protocols brought it to ensure that our plant remains at full capacity throughout the COVID pandemic period as we have faced unprecedented demand for our product in various waves.”